Industryweek 4792 Investigators Probe Dreamliner Fire London Heathrow
Industryweek 4792 Investigators Probe Dreamliner Fire London Heathrow
Industryweek 4792 Investigators Probe Dreamliner Fire London Heathrow
Industryweek 4792 Investigators Probe Dreamliner Fire London Heathrow
Industryweek 4792 Investigators Probe Dreamliner Fire London Heathrow

Investigators Probe Dreamliner Fire at London Heathrow

July 14, 2013
"Ethiopia's Dreamliners will continue to fly," Ethiopian Airlines spokesman Hailu Teklehaimanot said. "The incident at Heathrow is not being treated as flight-related as the incident happened after being grounded for eight hours."

LONDON—Investigators searched over the weekend for the cause of the fire onboard a 787 Dreamliner parked at London's Heathrow airport, which raises further questions about the safety of Boeing's next-generation jet.

A team from Britain's Air Accident Investigation Board was deployed following the blaze on Friday afternoon on the Ethiopian Airlines plane, which was fortunately empty at the time.

"The aircraft was moved to a secure hangar early this morning. The investigation is ongoing," said a spokesman for the AAIB, an agency of the Department of Transport.

Television pictures showed burn marks on the top of the plane near the back, just in front of the vertical stabilizer.

The U.S. Federal Aviation Administration said it had also sent an official to support the work of the U.S. National Transportation Safety Board in Britain.

A spokesman for Ethiopian Airlines said it was investigating the incident but had no plans to ground its fleet of four 787 Dreamliners.

"Ethiopia's Dreamliners will continue to fly," Ethiopian Airlines spokesman Hailu Teklehaimanot said. "The incident at Heathrow is not being treated as flight-related as the incident happened after being grounded for eight hours."

The fire is a blow for Boeing (IW 500/14), which had to temporarily withdraw the Dreamliner from service earlier this year after concerns that batteries on board could cause fires.

The U.S. aviation giant has since rolled out modifications that it said would ensure the planes were safe.

Boeing's shares closed 4.7% lower at $101.87 in New York trading on Friday, clawing back from a dive of more than 7%.

Fire Causes Airport Delays

Heathrow shut down for 90 minutes after the incident, and the world's busiest international passenger air hub was still reporting knock-on delays on Saturday.

"The airport is fully operational but with some flight delays and cancellations," Heathrow said in a statement.

A Heathrow spokeswoman said about 40 flights had been cancelled throughout the day, largely due to aircraft being out of place, but said delays to other flights were "minimal."

In a separate incident on Friday, another Dreamliner flying from Manchester to Florida was forced to turn back after experiencing a "technical issue" after take-off.

It was operated by Thomson Airways, which had only three days earlier become the first British airline to fly the plane.

The airline said the diversion was a precautionary measure, adding: "Passengers have disembarked and our dedicated team of engineers are now inspecting the aircraft."

A global grounding order on the Dreamliner was issued in January after lithium-ion batteries overheated on two different jets, with one of them catching fire while the aircraft was parked.

Boeing has not been able to identify the root cause of the problems—a source of major embarrassment to the company—but said its modifications would prevent the problems reoccurring.

In April, an Ethiopian Airlines Dreamliner—reported to be the same plane that caught fire at Heathrow—flew from Addis Ababa to Nairobi on the first commercial flight since the grounding.

But the planes have been dogged by problems, with a string of flights worldwide canceled or diverted due to mechanical issues.

Copyright Agence France-Presse, 2013

Popular Sponsored Recommendations

Empowering the Modern Workforce: The Power of Connected Worker Technologies

March 1, 2024
Explore real-world strategies to boost worker safety, collaboration, training, and productivity in manufacturing. Emphasizing Industry 4.0, we'll discuss digitalization and automation...

3 Best Practices to Create a Product-Centric Competitive Advantage with PRO.FILE PLM

Jan. 25, 2024
Gain insight on best practices and strategies you need to accelerate engineering change management and reduce time to market. Register now for your opportunity to accelerate your...

Transformative Capabilities for XaaS Models in Manufacturing

Feb. 14, 2024
The manufacturing sector is undergoing a pivotal shift toward "servitization," or enhancing product offerings with services and embracing a subscription model. This transition...

Shifting Your Business from Products to Service-Based Business Models: Generating Predictable Revenues

Oct. 27, 2023
Executive summary on a recent IndustryWeek-hosted webinar sponsored by SAP

Voice your opinion!

To join the conversation, and become an exclusive member of IndustryWeek, create an account today!